Airline Mogul Forum

Building Terminal, only 4 slots availabe

Don · 3 · 1010

Don

  • Airline Operative
  • *
    • Posts: 2
    • View Profile
on: April 09, 2010, 06:26:56 pm
Think is't a limit, but I might miss some options ...

At Hong Kong - Chek Lap Kok International (PW#1170) I've rented 2 gates and I'd like to build a Terminal to reduce the (future) costs. Since the minimum # gates to build is 5 I'm confused there are only 4 slots availabe for me at this moment. Does this limit deals with the 'only' 2 rented gates? If so, why?

The airport information tells me there are 297 gates available.

Don


StephenM

  • Administrator
  • Airline Board Member
  • *****
    • Posts: 6039
    • View Profile
Reply #1 on: April 09, 2010, 07:30:06 pm
You will have to use the gates that you rent. The system is designed to stop you from renting more gates than you need in order to deprive others of accessing gates. Try using atleast 3 gates before you can rent 5.
Stephen Murphy
Airline Mogul Chief Developer


pseudoswede

  • Airline Manager
  • ***
    • Posts: 1278
  • Play to win, not imitate.
    • View Profile
Reply #2 on: April 09, 2010, 08:34:53 pm
Or rent two more gates, create the focus city, build a terminal with 5 gates, then return all 4 rented gates.
             
Planet Express Airways
Member of the FT Alliance
ID: 3446

Opinions expressed in my posts are suggestions to achieve maximum airline value and top rankings.
If you do not wish for either, then feel free to ignore.


 

SMF spam blocked by CleanTalk