Airline Mogul => Suggestions => [+] Suggestions => Topic started by: EXTspotter on December 29, 2006, 07:29:31 pm
Title: [+] Plane Deliveries
Post by: EXTspotter on December 29, 2006, 07:29:31 pm
I think that the game would be better if instead of having plane deliveries in big chunks of 24 or whatever, that planes were delivered in a moving orderline way. Also if manufacturer order books with delivery scheduals would improve the game and make it more realistic. Here are some examples:
There are 2 boeing lines. One for Narrow Bodies and One for Wide Bodies: The following aircraft take this amount of game days on the line in manufacturing:
For this, the first 5 narrow bodies and 5 wide bodies would automatically start being built, it would take the following amount of time to complete the narrow body line:
1. 4 2. 6 5. 5 7. 4 8. 4
From the 5th one, they would be built as one of those ahead in the queue was completed:
9. (takes place of #1) (4) + 4 = 8 days 11. (takes place of #7) (4) + 3 = 7 days 12. (takes place of #8 ) (4) + 3 = 7 days
The same thing happens with the Wide Body:
3. 9 4. 12 6. 10 10. 9 13. 9
Same happens as before, as one plane is completed, another takes its place on the line:
14. (replaces #3) (9) + 12 = 21 days 15. (replaces #10) (9) + 11 = 20 days 16. (replaces #13) (9) + 12 = 21 days
Tell me what you think.
EXTspotter
Title: Plane Deliveries
Post by: EXTspotter on December 29, 2006, 10:08:32 pm
Can people please give opinions on improvements? I really really want to hear them.
Title: Plane Deliveries
Post by: MUFC4evr on December 29, 2006, 10:11:18 pm
i think it is a well-thought idea alex. BTW check ur private messages in here
Title: Plane Deliveries
Post by: StephenM on December 30, 2006, 11:56:02 am
Good job on that suggestion, really well thought out. I do think that the current delivery system is very simplistic and I will try and implement a system similar to this as soon as possible!